Sunday, July 20, 2008

Closing up the ceiling.






Closing up the ceilings, patching the walls. Things start to look a lot better when can't see the roof from the kitchen. Can lights will be set after the texture.






Knocking out the old stuff!

The cabinets were redone by Kellie, she was great to work with on this project. The ceiling was opened up to raise the ceiling to 8 feet, matching the rest of the house.





Ceramic tiles were removed, granite will be installed a little later. The backsplash will be done in Travertine.




Kitchen Remodel in Greenstone Country





Some quick pictures of the Kitchen Remodel in Greenstone Country.
 
AnooX banner here
Changing LINKS